Apartment finishes in Georgia: black, white and green frame

These local terms describe the interior condition at handover, separately from the building’s construction stage. Identical labels can cover different work. Compare the written specification for your particular project rather than treating the names as international standards.

What each package includes — a shared checklist

These four illustrative examples were compiled by Real Estate Hub. They are not a specific developer’s offer or a mandatory standard. Packages with the same name can differ by developer and project. Verify the written specification before agreeing.

Yes — included in this illustrative package. No — excluded from this example. A tick does not confirm that the work has already been completed.

This renovated example excludes kitchen furniture and household appliances; gas and underfloor heating are also excluded. These choices do not apply to every project. Balcony works apply only to apartments with a balcony. Lifts, entrances and common areas require separate checks.

Scroll the table horizontally to view all four packages.

Illustrative site packages: black, white and green frame, and renovated apartment
Work / equipmentBlack frameWhite frameGreen frameRenovated apartment
Partitions and openings
Internal partitions No Yes Yes Yes
Door openings No Yes Yes Yes
Walls and ceilings
Wall plastering No Yes Yes Yes
Wall skim coat No No No Yes
Wall primer No No No Yes
Final wall finish No No No Yes
Ceiling levelling No No No Yes
Final ceiling finish No No No Yes
Floors
Floor screed No Yes Yes Yes
Floor thermal insulation No No No No
Floor sound insulation No No Yes Yes
Final floor covering No No No Yes
Skirting boards No No No Yes
Doors and windows
Window installation Yes Yes Yes Yes
Balcony door installation Yes Yes Yes Yes
Apartment entrance door Yes Yes Yes Yes
Window reveal finishing No No No Yes
Interior window sills No No No Yes
Interior doors No No No Yes
Electricity and communications
Electricity supply to the apartment Yes Yes Yes Yes
Electricity meter installation Yes Yes Yes Yes
Distribution board and protection No No Yes Yes
Internal electrical wiring No No Yes Yes
Earthing installation No No Yes Yes
Sockets and switches No No No Yes
Light fittings No No No Yes
Internet and TV cabling No No Yes Yes
Indoor intercom unit No No No Yes
Water and drainage
Water supply to the apartment Yes Yes Yes Yes
Water meter installation Yes Yes Yes Yes
Internal cold-water pipes No No Yes Yes
Internal hot-water pipes No No Yes Yes
Drainage connection point Yes Yes Yes Yes
Internal drainage pipes No No Yes Yes
Water shut-off valves No No Yes Yes
Gas
Gas supply to the apartment No No No No
Gas meter installation No No No No
Internal gas pipes No No No No
Gas leak detector installation No No No No
Heating, cooling and ventilation
Heating pipework No No Yes Yes
Boiler or other heat source No No No Yes
Radiator installation No No No Yes
Underfloor heating No No No No
Heating thermostat No No No Yes
AC pipework and drain preparation No No Yes Yes
Air conditioner installation No No No No
Connections to ventilation ducts No No Yes Yes
Bathroom extractor fan No No No Yes
Bathroom and wet areas
Wet-area waterproofing No No No Yes
Bathroom wall and floor tiling No No No Yes
Toilet installation No No No Yes
Washbasin installation No No No Yes
Bath or shower installation No No No Yes
Bathroom taps and mixers No No No Yes
Heated towel rail No No No No
Bathroom furniture No No No No
Kitchen, furniture and appliances
Kitchen cabinets No No No No
Kitchen worktop No No No No
Kitchen splashback No No No No
Kitchen sink and tap No No No No
Kitchen extractor hood No No No No
Hob installation No No No No
Oven installation No No No No
Refrigerator supply No No No No
Dishwasher installation No No No No
Washing machine installation No No No No
Built-in wardrobes No No No No
Room furniture supply No No No No
Balcony
Balcony waterproofing and drainage Yes Yes Yes Yes
Balcony floor finish Yes Yes Yes Yes
Balcony railing Yes Yes Yes Yes
Balcony wall and ceiling finishes Yes Yes Yes Yes
Balcony light and socket No No No Yes
Checks and handover
Testing the engineering systems being handed over Yes Yes Yes Yes
Commissioning installed equipment No No No Yes
Cleaning after works Yes Yes Yes Yes
As-built concealed-services drawings No No Yes Yes
Manuals and warranties for installed equipment No No No Yes
Handover record and defect list Yes Yes Yes Yes

Black frame

Unfinished interior

A basic unfinished interior with substantial work left for the buyer.

  • What it may include: The basic structure; check whether windows, the entrance door and partitions are included in this project.
  • Work that may remain: Partitions, utility distribution, preparation of walls and floors, followed by final finishes may all remain.
  • Questions for the developer: Where do utilities terminate? Which partitions are included? Which alterations need agreement?
  • Budget and time: Allow for organising and coordinating more work. Obtain a defined scope and estimate before comparing prices.

White frame

Partially prepared interior

Some preparatory work is complete; the exact scope needs confirmation.

  • What it may include: Often refers to plastered walls or floor screed. Electrical, plumbing and heating provision can vary.
  • Work that may remain: Some utility work, final surface preparation, flooring, painting, doors and bathrooms may remain.
  • Questions for the developer: Are walls ready for paint or do they need further preparation? Is electricity brought to the unit or distributed inside?
  • Budget and time: Assess the quality of completed work too: corrections can add cost and time.

Green frame

Enhanced preparation package

A more prepared package whose contents are defined by the particular developer.

  • What it may include: May include more extensive utility preparation or additional surface work. Do not assume inclusions from the label alone.
  • Work that may remain: Final finishes, equipment, doors or bathroom works may still be needed.
  • Questions for the developer: What does this add to the same project’s white frame? Are the boiler, radiators, electrical panel or waterproofing included?
  • Budget and time: Compare the price difference with the actual additional work. Green frame is not, by itself, proof of environmental certification.

Fully finished

Check furniture and appliances

A finished interior; furniture, appliances and practical move-in readiness still need checking.

  • What it may include: Completed surfaces, doors and fixtures within the agreed inventory.
  • Work that may remain: Furniture, kitchen units, appliances, lighting or utility activation may still need arranging.
  • Questions for the developer: What stays in the apartment? Request models, quantities, warranties and a handover checklist.
  • Budget and time: Less remaining work does not rule out defects. Inspect workmanship and test equipment at handover.

What should you compare in every offer?

Use these questions for each option. Illustrations are conceptual and do not represent any specific project’s inclusions.

  • Partitions and layout: Which partitions are included, in which materials and according to which plan?
  • Walls and ceilings: What preparation is complete and what remains before decoration?
  • Floors: Are screed, levelling, insulation and final floor finishes included?
  • Doors and windows: What are the specifications for internal doors, entrance door, glazing and installation?
  • Electricity: Is there only an incoming connection, or internal wiring, panel, sockets and switches too?
  • Water and heating: Where are connection points? Are boiler, radiators and system testing included?
  • Bathrooms: Are waterproofing, tiles, sanitary fixtures and ventilation included?
  • Furniture and appliances: Which items and models are included, and who provides their warranties?

From purchase price to full budget

Full budget = purchase price + remaining work + materials and equipment + agreed additional expenses.

  • Compare offers at the same desired final condition.
  • Request quantities, materials, labour costs, exclusions and timings separately.
  • Clarify delivery, waste removal and supervision of the works.
  • Agree timing after viewing and assessing the scope; allow a contingency for possible changes.

How to inspect at handover

Compare actual condition with the contractual specification. Photograph discrepancies and agree repair deadlines in writing.

Questions before you begin

Is white frame ready to live in?

Not automatically. Check outstanding finishes, bathrooms, equipment and working utilities. The label does not establish move-in readiness.

Does green frame mean an eco-certified apartment?

Do not draw that conclusion from the label alone. Verify energy performance, materials and any certification separately.

How does finishing differ from construction stage?

Construction stage describes building progress; frame condition describes the apartment interior at handover. A completed building can still contain black-frame apartments.

Which option suits someone buying from abroad?

Compare outstanding work, your ability to supervise it and the full cost. Request current video, a specification you understand and independent inspection where needed.

Sources and scope

Sources illustrate terminology and a specific project’s specification. They do not confirm a partnership or a current offer. Request the current annex for your chosen project before buying.